Skip to main content
DARS

DARS

Change Number: 2024-0626
Effective Date: 06/26/2024

Appendix A - Approval and Delegation Matrix

Appendix A - Approval and Delegation Matrix

DARS Approval & Delegation Matrix

(30 November 2023)

*All common delegations can be found within the DARS text. *Further Delegable Columns with "No" indicate retained responsibilities or those that are non-delegable or cannot be delegated further per regulation or statue.
Part Federal Reference (FAR) Description of Authority Defense Reference (DFARS/PGI)DISA Reference (DARS/PGI)Approving Official Delegable Level
1-Conducting a preaward peer review for competitive and non-competitive procurements above $1B, and any designated MDAP/USD(A&S) special interest programs.201.170(a)(1)(i)201.170(a)(1)(i) and (ii)DPCNo
1-Conducting component preaward peer reviews for competitive procurements valued at $500M or more but less than $1B; and noncompetitive procurements valued at $500 or more but less than $1B.No additional guidance201.170(b)(1)HCAYes, no lower than CoCOs
1-Conducting component preaward peer reviews for procurements valued below $500M. No additional guidance201.170(b)(2)HCAYes, no lower than CoCOs
1-Postaward independent management reviews of contracts for services valued at $500 million or more.No additional guidance201.170(b)(3)(S-90)HCAYes, no lower than CoCOs
11.301Issue or authorize the issuance of agency acquisition regulations that implement or supplement FAR.No additional guidance1.304(S-90)HCANo
11.602-3(b)Ratification of unauthorized commitmentsNo additional guidance1.602-3(b)(2)SPESPE all DISA and non-DISA at or above $1M; HCA non-DISA below $1M;
11.603-1Selection, Appointment, and Termination of Appointment for Contracting OfficersNo additional guidance1.603-1HCANo
1-Review and approval of contract actions by Contract Decision Authority (CDA) or Source Selection Authority (SSA). CDA for acquisitions processed using FAR Subpart 8.4, Part 12, Subpart 13.5, and Subpart 16.5 procedures. SSA for acquisitions processed with FAR Part 15 procedures. No additional guidance1.9000SPE <$100M Contracting Officer >$100M - <$250M CoCOs >$250M-<$500M HCOs >$500M and Special Interest Actions
33.104-4(a)Authority to authorize access to contractor bid or proposal or source selection information. No additional guidance3.104-4(a)HCANo
33.104-5(c)2Authorization of disqualified official to resume participation in a procurement.No additional guidanceNo further guidanceHCANo
33.104-7(b) - (g)Actions and determinations related to possible or actual procurement integrity violations.No additional guidance3.104-7V/PSENo
33.602Authorization of exception to award contract to Government employee or their business.No additional guidance3.602HCANo
33.703Make determinations concerning voiding and rescinding contracts upon final conviction for bribery, conflicts of interest or violations of 18 U.S.C. 201-224.203.7033.705The authority to act rests with OUSD (AT&L); HCA is the designee for reporting and decision. No
33.704(c)Consider declaring void and rescinding contracts, recovering amounts expended, and recommending suspension/debarment upon conviction/preponderance of evidence for an offense punishable under 41 U.S.C. 2105No additional guidance3.705HCANo
33.906Remedies for Whistleblower Protections for Contractor Employees.203.9063.906HCANo
33.1104Authority to impose conditions that mitigate conflicts of interest or grant a waiverNo additional guidanceNo further guidanceHCANo
55.404-1(a)Release of long-range acquisition estimatesNo additional guidance5.404-1(a)PSE Proc. DirectorateV/PSE
66.202(a)Full and open competition after exclusion of sources. Approval authority for determinations and findings in order to establish or maintain alternative source(s) for the supplies or services being acquired.206.2026.202SPESPE over $100M; HCA $15M-$100M; CoCO $750K-$15M; Contracting Officer $750K and below
6-Only one responsible source. Authority to waive the requirement to post a request for information or a sources sought notice, and include the results of this inquiry in the justification required by FAR 6.303.PGI 206.302-1(d)206.302-1(d)HCANo
66.302-2(d)(1)(ii)Unusual and compelling. Total period of performance of a contract awarded or modified may not exceed one year, including all options, unless the head of the agency determines that exceptional circumstances apply (including any subsequent modifications) and a separate determination is required. -No further guidanceSPENo
6-International Agreement. Determination that J&A is not required for an international agreement and preparation of document such as LOA that has the effect of requiring use of other than competitive procedures for the acquisition.206.302-4(c) 206.302-4(c) HCANo
66.302-5(b)(4)Approval authority for J&As for Sole Source 8(a) awards exceeding $100 million.No additional guidanceNo further guidanceSPENo
66.302-7Public Interest. Full and open competition need not be provided for when the Head of Agency determines that it is not in the public interest in the particular acquisition concerned.No additional guidance206.302-7SPENo
66.304(a)Approval of J&A, inclusive of FAR Part 6, 8, 13, 16 procedures. No additional guidance206.303-1(S-92)(b)SPESPE over $100M; HCA $15M-$100M; PACA $750K-$15M; Contracting Officer $750K and below
77.103Acquisition Plan Approval Authority207.103(d)(i)7.103 Table7-1SPEYes, no lower than CoCOs
77.107-2Approval authority for consolidation determination and findings (D&F). No additional guidance7.107-2(a)HCANo
77.107-3(f)(2)Justification for bundling.No additional guidanceNo further guidanceSPENo
88.404(h)(3)(ii)(C)Approval of D&Fs for T&M or LH orders against FSS contracts when base period and all options periods exceeds three years.No additional guidanceNo further guidanceHCANo
88.405-3(a)(3)(ii)Determination that single-award BPA with an estimated value exceeding $100 million (including any options), may be awarded.No additional guidanceNo further guidanceHCANo
88.405-6(b)(3)(ii)(C)Items particular to one manufacturer posting. Determination that access through eBuy is not in Government's best interests.No additional guidanceNo further guidanceSPEYes, no further than HCA.
88.405-6(d)(1)Limiting Sources. Approval of Proposed order or BPA with an estimated value exceeding the simplified acquisition threshold, but not exceeding $750,000.No additional guidancePGI 8.405-6(S-90)Contracting OfficerNo
88.405-6(d)(2)Limiting Sources. Approval of Proposed order or BPA with an estimated value exceeding $750,000, but not exceeding $15 million.No additional guidancePGI 8.405-6(S-90)PACANo
88.405-6(d)(3)Limiting Sources. Approval of Proposed order or BPA with an estimated value exceeding $15 million, but not exceeding $100 million.No additional guidancePGI 8.405-6(S-90)HCANo
88.405-6(d)(4)Limiting Sources. Approval of Proposed order or BPA with an estimated value exceeding $100 million.No additional guidancePGI 8.405-6(S-90)SPENo
99.202(a)Prepare and approve written justifications establishing a contractor qualification requirement.PGI 209.202(a)(1)No further guidanceHCANo
99.202(b)Waiver of requirements of 9.202(a)(1)(ii) through (4) for up to 2 years with respect to the item subject to the qualification requirement.No additional guidanceNo further guidanceHCANo
99.202(e)Awarding a Qualification Requirement before determination madeNo additional guidance9.202(e)HCANo
99.206-1(b)Not enforcing acquisitions subject to qualification requirement when an emergency exists.No additional guidance9.206-1(b)HCANo
99.405(a), 9.405-1(b),9.405-2(a), 9.406-1(c) and 9.407-1(d)Approval of written determination to continue to do business with a suspended or debarred contractor. No additional guidance209.405(a) and 209.405(b)(ii)HCANo
99.503, 9.5049(c);9.506(d)(3) Waiver approval for Organizational and Consultant Conflicts of Interest.No additional guidance9.503; 9.506(S-90)HCANo
1010.002(e)Document the results of market research in a manner appropriate to the size and complexity of the acquisition.No additional guidance10.002(b)(2)Contracting OfficerNo
11-Determination that items are to be used to support a contingency operation or to facilitate defense against or recovery from nuclear, biological, chemical, radiological attack, cyber attack, international disaster assistance, and response to an emergency or major disaster.211.274-2(b)(1)No further guidanceHCANo
11-Approval of D&F for exception for contractor from requirement to provide DoD unique item ID. 211.274-2(b)(2)(i)(B)No further guidanceHCANo
12-Determination that the prior determination was appropriate and still applicable or issue a determination that the prior use of FAR part 12 procedures was improper or that it is no longer appropriate to acquire the item using FAR part 12 procedures, with a written explanation of the basis for the determination.212.102(a)(ii)(B)212.102(a)(ii)(B)(S-90)HCANo
12-Approval to make determination to enter into contracts above $10M for facilities related services, knowledge-based services (except engineering services), medical services, or transportation services that are not commercial services.212.272(b)(2)(i)No further guidanceHCANo
1212.301(f)Approval of supplementing the provisions and clauses of FAR part 12No additional guidanceNo further guidanceSPENo
1515.204(e)Authority to exempt individual contracts from the use of the uniform contract format.No additional guidanceNo further guidanceHCANo
1515.303(a)Appointment of SSAs for acquisitions for systems and services, acquired through the Defense Acquisition System, for which milestone decision authority (or other decision authority) is at the AAE or Office of the Secretary of Defense level IAW the applicable Adaptive Acquisition Framework DoDI.No additional guidanceNo further guidanceHCAYes, no lower than CoCOs
1515.303(a)Appointment of SSAs for other service acquisitions with a total planned dollar value of $500 million or more, or service acquisitions identified by the ASA(ALT) as a special interest. See DoDI 5000.74No additional guidanceNo further guidanceHCANo
1515.303(a)Appointment of SSAs all other acquisitions for which formal source selection procedures are used.No additional guidanceNo further guidanceHCANo
15-Determination and Findings for waiving the requirement to resolicit if only one source is received and/or you solicit for less than 30 days. 215.371-5(a) & (b)215.371-5(b)HCAYes, no lower than CoCOs
1515.403-1(c)(4)Waiving requirement for submission of certified cost or pricing data.DFARS PGI 215.403-1(c)(4)(A)(2)No further guidanceSPE >$100M HCA <$100MNo
1515.403-3(a)(4)Determination that it is in the best interest of the Government to make award to offeror who does not comply with requirement to submit other than certified cost or pricing data.DFARS PGI 215.404-1(a)(i)(A)(iv)215.403-3(S-90)HCANo
15-Waiver of use of forward pricing rate agreements when such rates are available.215.407-3(b)(i)No further guidanceHCANo
15-Approve determination (when contracting with the Canadian Commercial Corporation) that data other than certified cost or pricing data are needed in order to determine that the price is fair and reasonable. 215.408(3)(i)(A)(2) & 225.870-4(c)(2)(ii)No further guidanceHCANo
15-Approve determination (when contracting with the Canadian Commercial Corporation) that it is reasonably certain that data other than certified cost or pricing data will be needed in order to determine that the price of modifications is fair and reasonable.215.408(3)(ii)(A)(2) & 225.870-4(c)(2)(ii)No further guidanceHCANo
1616.206-3(d)Approval of fixed-price contracts with retroactive price redetermination.No additional guidanceNo further guidanceHCANo
1616.401(d)Approval of D&F for all award-fee contracts (except for cost reimbursement award-fee contracts in excess of $25 million) justifying use of this type of contract.216.401(d)(i)No further guidanceHCANo
1616.401(d)Approval of D&F for all incentive contracts (except for cost reimbursement contracts valued in excess of $25 million) justifying use of this type of contract.216.401(d)(ii)No further guidanceHCANo
1616.401(d)Approval of D&F for cost reimbursement incentive or award fee contracts valued in excess of $25 million.216.401(d)(i)No further guidanceHCANo
16-Approval of remaining award fee pool less than 40% at time of final evaluation.216.405-2(1)No further guidanceHCANo
1616.504(c)(1)(ii)(D)(1)No task or delivery order contract in an amount estimated to exceed $100 million (including all options) may be awarded to a single source without determination. 216.504(c)(1)(ii)(D)(1)16.504(c)(1)(ii)(D)(1)HCANo
1616.505(b)(8)Designate a task and delivery order ombudsman for the contracting activity.No additional guidance16.505(b)(8)SPEV/PSE
1616.601(d)(1)(ii)Approval of D&Fs for use of T&M when base period + options exceeds 3 years.216.601(d)(i)(A)(2)216.601(d)(i)(A)(1)(i)HCONo
1616.603-2(c) & 52.216-25(c)Approval of Contracting Officer's price reasonableness for Letter Contract under dispute.No additional guidanceNo further guidanceHCANo
1616.603-2(c)(3)Approval of Contracting Officer's determination of reasonable price to definitize UCA under certain circumstances.No additional guidanceNo further guidanceHCANo
1616.603-3Authorizing use of letter contract216.603-3No further guidanceHCANo
1717.104(b)Authorize modifications of the requirements for multi-year contracts. No additional guidance17.104(b)HCANo
1717.105-1(b)Authorize use of multiyear contract for supplies.No additional guidanceNo further guidanceHCANo
1717.106-3(e)Authorizes recurring costs in cancellation ceiling.No additional guidance17.106-3(e).HCANo
1717.106-3(f)Authorizes the use of a solicitation requesting only multi-year prices, provided that dual proposals are not necessary to meet the objectives in FAR 17.105-2.No additional guidanceNo further guidanceHCANo
1717.106-3(g)Approves the use of variable unit prices on multi-year contracts provided that, for competitive proposals, there is a valid method of evaluation.No additional guidanceNo further guidanceHCANo
1717.108(b)Written notification to Congress to award a multi-year contract which includes a cancellation ceiling in excess of $150M.No additional guidanceNo further guidanceHCANo
17-Entering into a multi-year contract for a period of not more than 5 years for certain types of services, even though funds are limited by statute to obligation only during the fiscal year for which they were appropriated; the Head of Agency must follow certain principals and before entering into a multiyear contract for services; and the head of the agency must make a written determination that there will be continuing requirement for the services.217.171(a), (b), (c), and (d)No further guidanceHead of Agency Yes, no further than HCA.
17-For contracts equal to or greater than $750M, determination that the conditions required by paragraphs (h)(2)(i) through (vii) of this section will be met by such contract, in accordance with the Secretary’s certification and determination required by paragraph (h)(2) of this section.217.172(f)(2)No further guidanceHCANo
1717.204(e)Approval of ordering periods in excess of 10 years for task/delivery order contracts.217.204(e)(i)(C)No further guidanceHCANo
1717.204(e)Approval for task / delivery order performance more than 1 year beyond 10-year base contract limit in 217.204(e)(i)(C)217.204(e)(iii)No further guidanceSPENo
1717.502-2(c)(2)Approval of D&F for Economy Act order to obtain supplies or services by interagency acquisitions when servicing agency covered by the FAR.No additional guidanceNo further guidanceContracting OfficerNo
1717.703(e)Waiver determination for acquisitions of supplies and services by nondefense agencies on behalf of DoDSee DPC Memo Subject: Re-delegation of Authority Under Section 801 FY18 NDAA "Internal Controls for Procurements on Behalf of DoD by Certain Non-Defense Agencies", dated 17 June 2019.No further guidanceSPENo
17-Approval of unilaterally definitizing UCAs with a value greater than $50M.217.7404(b)(2)No further guidanceHCANo
17-Approves Undefinitized Contract Actions (UCA).217.7404-1No further guidanceHCANo
17-Approval of determination to extend definitization schedule beyond an additional 90 days.217.7404-3(a)(1)No further guidanceHCANo
17-Ensures profit reflects risk when UCA is definitized after substantial portion of performance is completed.217.7404-6No further guidanceHCANo
1919.1305(d)(2)Determining urgent and compelling circumstances exist to proceed with acquisition upon receipt of SBA's notice of intent to appeal.No additional guidanceNo further guidanceHCANo
1919.1405(d)Issuing a decision in response to appeal of the Contracting Officer's rejection of SBA recommendation to set aside a procurement for a particular socioeconomic category. No additional guidanceNo further guidanceHCANo
2222.101-1(e)Designation of programs or requirements for which contractors are required to notify Government of actual or potential labor disputes that delay or threaten to delay timely contract performance.DFARS PGI 222.101-322.101-3(S-90)HCAHCO
2222.103-4Authority to approve overtime222.103-4No further guidanceAgency Approving OfficialNo
2222.302(c)Determination on Liquidated DamagesNo additional guidanceNo further guidanceSPENo
2222.604-2(b)(1)Exemption of specific contracts or classes of contracts from the inclusion or application of one or more of the Small Business Act stipulationsNo additional guidanceNo further guidanceHead of Agency No
2222.805(a)(8)Approval to award without preaward clearance.No additional guidanceNo further guidanceHCA No
2323.105Exemption Authority to purchase sustainable productsNo additional guidanceNo further guidanceHead of Agency No
2323.204Determination not to procure an ENERGY STAR or FEMP-designated product if no ENERGY STAR or FEMP-designated product is reasonably available or no ENERGY STAR or FEMP-designated product is cost effectiveNo additional guidanceHead of AgencyNo
2323.506(e)Determination to suspend contract payments, terminate a contract for default, debar or suspendNo additional guidanceNo further guidanceHead of AgencyNo
2323.903Determination that the use of Compliance With Environmental Management Systems clause for facilities located outside the U.S.No additional guidanceNo further guidanceHCANo
2525.103(a)Determination that domestic preference would be inconsistent with public interest.No further guidanceHead of Agency
25Determination that domestic preference would be inconsistent with public interest.225.103(a)(i)(A)No further guidanceOUSDNo
25Determination that domestic preference would be inconsistent with public interest for acquisitions valued at or below SAT.225.103(a)(ii)(B)(1)No further guidanceLevel above KONo
25Determination that domestic preference would be inconsistent with public interest for acquisitions valued between SAT and less than $1.5M.225.103(a)(ii)(B)(2)No further guidanceCoCONo
25Determination that domestic preference would be inconsistent with public interest for acquisitions valued at $1.5M or more.225.103(a)(ii)(B)(3)No further guidanceHCANo
2525.103(b)(2)(i)Approval of determination for nonavailability exception to Buy American statute.No further guidanceHCANo
25Approval of determination for nonavailability exception to Buy American statute for acquisitions valued at or below SAT225.103(b)(ii)(A)No further guidanceLevel above KONo
25Approval of determination for nonavailability exception to Buy American statute for acquisitions valued between the SAT and less than $1.5M225.103(b)(ii)(B)No further guidanceCoCONo
25Approval of determination for nonavailability exception to Buy American statute for acquisitions valued at $1.5M or more225.103(b)(ii)(C) No further guidanceHCANo
2525.106(b)Determination that use of higher evaluation factors are appropriateNo additional guidanceHead of AgencyYes, no further than HCA.
25-Approval of national interest waiver for purchase by overseas purchasing activity in support of US forces stationed abroad.225.403(c)(ii)(A)HCANo
25-Determination that data other than certified cost/pricing data from Canadian Commercial Corporation are needed in order to determine that price is fair and reasonable in circumstances other than those in 225.870-4(c)(2)(i)225.870-4(c)(2)(ii)No further guidanceHCANo
25-Determination that it is in the best interest of the Government to make award to offeror who does not comply with requirement to submit other than certified cost or pricing data225.870-4(c)(5)No further guidanceHCANo
25-Waiver of restrictions on certain foreign purchases on a case-by-case basis225.7008(a)(2)No further guidanceHCANo
25-Determination to use enhanced authority for individual acquisition of products or services with a value of less than $100M from Afghanistan.225.7703-2(b)(2)(i)No further guidanceHCANo
25-Authority to terminate or void contracts and to restrict future awards directly or indirectly to any person that is actively opposing United States or coalition forces involved in a contingency operation in which members of the armed forces are actively engaged in hostilities.225.7793 (Class Deviation 2015-O0016)No further guidanceHCANo
25-Determination to use enhanced authority for individual acquisition of products or services with a value of $93M or more, or a class of acquisitions, from Djibouti.225.7798-4(b)(1)(ii) (Class Deviation 2016-O0005)No further guidanceHCANo
25-Determination to use authority for individual acquisition of products or services (including construction) with a value of $93M or more, or a class of acquisitions, from Afghanistan or a country along a major route of supply to Afghanistan.225.7799-2(b)(1)(ii) (Class Deviation 2016-O0004)No further guidanceHCANo
2727.303(e)(1)(ii)Determine that restriction or elimination of the right to retain title to any subject invention will better promote the policy and objectives of USC 35, chapter 18.No additional guidanceNo further guidanceHead of Agency No
2727.306(a)Allowing Government to Require Licensing to Third Parties of inventions when contracting with a small business firm or nonprofit organizationNo additional guidanceNo further guidanceHCANo
27-Notification that the person asserting the restriction that urgent or compelling circumstances do not permit the Government to continue to respect the asserted restriction.227.7103-13(d)(6)(iii) (See DFARS 252.227-7037(g)(2))No further guidanceHead of Agency No
27-Authorization to withhold payments (or exercise such other remedies an agency head considers appropriate) during any period if the contractor does not meet the requirements of the contract pertaining to the delivery of technical data.227.7103-14(a)(2)No further guidanceHead of Agency No
27-Notification that that urgent or compelling circumstances do not permit the Government to continue to respect the asserted restriction227.7203-13(e)(1) (See DFARS 252.227-7019(g)(3))No further guidanceHead of AgencyNo
2828.101-1(c)Class waivers may be authorized for bid guaranteesNo additional guidanceNo further guidanceCoCONo
2828.105Approval to use other types of bonds in connection with acquiring particular supplies or servicesNo additional guidanceNo further guidanceHCANo
2828.106-2(a)Approval of new surety bond covering all or some obligations on a bond previously approvedNo additional guidanceNo further guidanceHCANo
2828.106-6(c)Copies of payment bonds, provided for contracts, shall be furnished to any person who makes a requestNo additional guidance28.106-6(c)HCACoCo
2828.203-5Excluding individual from acting as a surety on bondsNo additional guidance28.203-5(a)HCANo
2828.305(d)Waiver of applicability of the Defense Base Act to any contract, subcontract, work location or classification of employeesNo additional guidanceNo further guidanceHead of AgencyNo
2828.311-1Waiver of requirement to use clause at FAR 52.228-7.228.311-1No further guidanceHCANo
28-Decision not to allow contractor to buy insurance for war-hazard losses.228.370(a)(2)No further guidanceHCANo
2929.303(a)Designation of Prime and Subcontractors as agents of the Government.No additional guidanceNo further guidanceHead of AgencyNo
3030.201-5(a) and (b)A waiver to CAS for a particular contract or subcontract.230.201-5(a)(2)No further guidanceHead of AgencyNo
3030.202-6(b)Authorization of a CAS covered contract award without obtaining submission of the required disclosure statement.No additional guidanceNo further guidanceHead of AgencyNo
3131Waive some or all requirements of FAR part 31 for Government contracts awarded in conjunction with conveyance of a utility system under 10 U.S.C 2688231.100-70 (Class Deviation 2011-O0006)No further guidanceHCANo
3131.205-6(g)(6)Permission to waive severance payment allowability limitationsNo additional guidanceNo further guidanceHCANo
3131.205-6(p)(4)(iii)Establish one or more narrowly targeted exceptions for employee compensation limits for scientists, engineers, or other specialists upon a determination that such exceptions are needed to ensure that the executive agency has continued access to needed skills and capabilities.No additional guidanceNo further guidanceHCANo
3232.201Determination that payment for commercial items maybe under such terms and conditions that are appropriate or customary in the commercial marketplaceNo additional guidanceNo further guidanceHead of AgencyNo
3232.402(c)(1)(iii)(B)Determination that statutory requirements and standards for advance payment are met and facilitates the national defenseNo additional guidanceNo further guidanceHead of Agency No
3232.407(d)Authorization of advance payments without interest under certain types of contractsNo additional guidanceNo further guidanceHead of Agency No
3232.501-2(a)(3)Approval of contractor's request for unusual progress paymentsDFARS PGI 232.501-2No further guidanceDirector, DPCNo
3232.803(d)Determination to include a no-set off commitment.232.803(d)No further guidanceContracting OfficerNo
32-Determination that conditions exist that limit normal business operations. 232.901(1)(ii)No further guidanceHCANo
32-Subsequent determinations as operational area becomes more stable or less stable-232.901(3)No further guidanceHCANo
3232.1106Authorization of other mechanisms for domestic and nondomestic EFTNo additional guidance32.1106(S-90)Contracting OfficerNo
3333.102(b)Make determinations when a solicitation, proposed award, or award does not comply with the requirements of law or regulationNo additional guidanceNo further guidanceHead of Agency No
3333.103(d)(4)Procedures for Independent Reviews by Interested PartiesNo additional guidance33.103(d)(4)HCACoCO and/or HCO
3333.104(b)(1)Protests before award. A contract may not be awarded unless authorized by HCA upon a written determination. No additional guidance33.104(b)(1)HCANo
3333.104(c)(2)Protests after award. HCA may authorize contract performance upon a written determination. No additional guidance33.104(c)(2)HCANo
3333.203(b)(2)Determination that the application of the Disputes statute to the contract with an international organization or a subsidiary body of that organization, would not be in the public interest.No additional guidanceNo further guidanceHead of Agency No
3333.215(a)Determination that continued performance is necessary pending resolution of claims arising under or related to the contract233.215(3)No further guidanceHCA No
34-Determination that the information submitted pursuant to DFARS 234.7002(d)(1) and (d)(2) [Relevant Information] is not sufficient to determine the reasonableness of price234.7002(d)(4)No further guidanceHCANo
37-Approval of contract or task order that is not performance-based (at or below $50M).-237.170.2(a)(1)CoCONo
37-Approval of contract or task order that is not performance-based (at or below $100M).DFARS 237.170-2(a)(1)237.170-2(a)(2)HCONo
37-Approval of contract or task order that is not performance-based (exceeding $100M).DFARS 237.170-2(a)(2)237.170-2(a)(3)SPENo
3737.204(a) thru (e)Determines if sufficient personnel are available to evaluate/analyze proposals for advisory and assistance service procurements.No additional guidanceNo further guidanceHead of AgencyNo
39-Determination that no commercial items are suitable to meet the agency’s needs for information technology products or services, as determined through the use of market research appropriate to the circumstances.239.101(1)No further guidanceHCANo
39-Authorization of provision of the necessary property as GFP or acquisition as CAP if conditions at FAR 45.102(b) met239.7402(b)(4)No further guidanceHead of Agency Yes, no further than HCA.
4242.202(c)(2)Approval of delegation of authority to issue orders under provisioning procedures and under BOAsNo additional guidanceNo further guidanceHCANo
42-Specific direction to conduct formal program of Government monitoring of contractor policies, procedures, and practices for controlling costs where significant Government business existsDFARS PGI 242.302(a)(S-75)(c)(1)(i)(C)No further guidanceHCANo
4242.703-2Waive the Certification requirement when in the interest of the US or written determination is made available to publicNo additional guidanceNo further guidanceHCANo
42-Approval to solicit voluntary refundsPGI 242.7100(4)No further guidanceHCANo
43-Waive the limitations in 243.204-70-2, 243.204-70-3 and 243.204-70-4 for unpriced orders necessary to support contingency or humanitarian or peacekeeping operations243.204-70-543.204-70HCANo
43-Ensure profit allowed reflects reduced cost risk due to substantial portion of the work complete before definitization243.204-70-643.204-70HCANo
4545.102(e)Determination that non-severable installation / construction of Government property on contractor owned real property is necessary and in Government's interestNo additional guidanceNo further guidanceHCANo
45-Exception to GFP ID for items used to support a contingency operation or to facilitate defense against or recovery from nuclear, biological, chemical, or radiological attack245.102(4)(ii)(B)No further guidanceHCANo
45-Determine exception to requirement for contractor to tag, label, or mark items (IUID) acquired from a small business or commercial item; Acquisition Category (ACAT) I program245.102(4)(ii)(C)(1)(i)No further guidanceCAENo
45-Determine exception to requirement for contractor to tag, label, or mark items (IUID) acquired from a small business or commercial item; all other programs245.102(4)(ii)(C)(1)(ii)No further guidanceHCANo
4545.301(f)Approval of contractor use of Government property for commercial use expected to exceed 25% of total use of Government and commercial work performedNo additional guidanceNo further guidanceHCANo
4848.102(a)Exemption for class of contracts from inclusion of value engineering provisionsNo additional guidanceNo further guidanceHead of Agency No
4848.104-3(a)Determination that cost of calculating & tracking savings will exceed benefits (sharing collateral savings)No additional guidanceNo further guidanceHCANo
4848.201(a)(6)Exempted the contract (or a class of contracts) from the requirements of this Part 48No additional guidanceNo further guidanceHead of Agency No
4848.201(e)Determination that Collateral savings computation not cost effective.No additional guidanceNo further guidanceHCANo

DARS Parts