Skip to main content
HTML

DIAR

Part Number: 1422

Department of the Interior Acquisition Regulation

Subpart 1422.4 - Labor Standards for Contracts Involving Construction

1422.404 Davis-Bacon Act wage determinations.

1422.404-6 Modifications of wage determinations.

The HCA is authorized to request an extension for awards not made within 90 days after bid opening.

1422.406-8 Investigations.

(a) Labor standards investigations required by FAR 22.406-8 shall be the responsibility of the CO.

(b) The CO's report of violations shall be submitted to the HCA, who is authorized to take the actions prescribed in FAR 22.406-8(d).

(c) The HCA shall forward all referrals through the OIG to the Attorney General.

1422.406-9 Withholding from or suspension of contract payments.

HCAs shall establish procedures for collection and disposition of funds withheld under FAR 22.406-9, including liquidated damages.

1422.406-13 Semiannual enforcement reports.

PAM is responsible for submitting the report required by FAR 22.406-13 to DOL. In accordance with DOL memoranda, PAM requires bureaus to submit the required reports by April 15 and October 15 for the reporting periods of October 1 through March 31 and April 1 through September 30, respectively.