Subpart 5349.70 – SPECIAL TERMINATION REQUIREMENTS
5349.7001 Congressional Notification on Significant Contract Terminations
The contracting officer must submit the proposed Congressional notification through the SCO to cognizant HCA workflow at least five workdays before the proposed termination date. The cognizant HCA action officer will forward the information to SAF/LLW. The contracting officer must not release the termination notice until Congress has been notified (see MP5349.7001 Congressional Notification on Significant Contract Terminations ).
5349.7003 Notification of Anticipated Terminations or Reductions
(b)(2)(i) The contracting officer must submit the draft notification through the SCO to the cognizant HCA Workflow as soon as the proposed termination/reduction is known. The cognizant HCA will forward the notification to SAF/AQ or SAF/SQ for signature (see MP5349.7003 Notification of Anticipated Terminations or Reductions ).