247.270-2 Technical provisions.
(a) Because conditions vary at different ports, and sometimes within the same port it is not practical to develop standard technical provisions covering all phases of stevedoring operations.
(b) When including rail car, truck, or intermodal equipment loading and unloading, or other dock and terminal work under a stevedoring contract, include these requirements as separate items of work.