5203.1003 Requirements.
(b) Notification of possible contractor violation. In addition to the actions required by FAR 3.1003(b), the contracting officer shall provide a copy of the notification, within 10 days of receipt, to the AIO by email at aio@navy.mil with the subject “FAR 3.1003 – Possible Contractor Ethics Violation.”