Skip to main content
GSAM

GSAM

Change Number: Change 192 GSAM Case 2024-G506
Effective Date: 10/28/2024

536.521 Specifications and drawings for construction.

536.521 Specifications and drawings for construction.

Insert the clause at 552.236-21, Specifications and Drawings for Construction, in solicitations and contracts if construction, dismantling, demolition, or removal of improvements is contemplated. Use the clause with its Alternate I when a design-build project delivery method will be followed—

(a)  With its Alternate I when a design-build project delivery method will be followed.

(b)  With its Alternate II when a construction-manager-as-constructor project delivery method will be followed.