47.305-4-90 Additional Wide Area Workflow (WAWF) information.
The contracting officer shall include Procurement Note G01 in solicitations and contracts that require f.o.b. destination and inspection/acceptance at destination.
*****
G01 Additional Wide Area Workflow (WAWF) Information (AUG 2017)
Contractors shall include the Transportation Control Number (TCN) and carrier shipment tracking information when submitting the DD250/iRAPT Receiving Report in Wide Area Workflow (WAWF) in order to assist with material inspection and acceptance.
*****