Previous PageTable Of ContentsDFARS Home PageNext Page

PART 3036 CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS


PART 3036 CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS


PART 3036 CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS


Subpart 3036.1 General
3036.104 Policy.
3036.104-90 Authority for one-step turn-key design-build contracting for the United States Coast Guard (USCG).
Subpart 3036.2 Special Aspects of Contracting for Construction
3036.201 Evaluation of contractor performance.
Subpart 3036.5 Contract Clauses
3036-570 Special precautions for work at operating airports.

Subpart 3036.1 General

3036.104 Policy.

3036.104-90 Authority for one-step turn-key design-build contracting for the United States Coast Guard (USCG).

The Head of the Contracting Activity (HCA) of the U.S. Coast Guard may use one-step turn-key selection procedures to enter into fixed-price design-build contracts in accordance with 14 U.S.C. 677.

Subpart 3036.2 Special Aspects of Contracting for Construction

3036.201 Evaluation of contractor performance.

(a)(2) Performance reports shall be prepared and entered into the Contractor Performance System (CPS) on an annual basis for contracts exceeding one year, or as otherwise required by (FAR) 48 CFR 36.201. Access to reports is through the CPS or the government-wide system, Past Performance Information Retrieval System (PPIRS).

Subpart 3036.5 Contract Clauses.

3036.570 Special precautions for work at operating airports.

Where any acquisition will require work at an operating airport, insert the clause at (HSAR) 48 CFR 3052.236-70, Special Precautions for Work at Operating Airports, in solicitations and contracts.

Previous PageTop Of PageTable Of ContentsDFARS Home PageNext Page