DLAD PGI PART 32 – CONTRACT FINANCING



DLAD PGI PART 32 – CONTRACT FINANCING

PGI SUBPART 32.9 – PROMPT PAYMENT

(Revised June 7, 2012 through PROCLTR 2012-37)

PGI 32.908-92 Constructive acceptance.

(a) The buyer shall fill in the blank based on the requisition’s stated number of calendar days needed for acceptance. The buyer may question the need for extending the period for constructive acceptance and ask for justification from the requiring activity.

(b) The following matrix can be used to determine the number of days needed for constructive acceptance based on the inspection code cited on the requisition. Contracting officers may use a different period than those stated in the table, if a more appropriate period is determined.

Constructive Acceptance Matrix Nonnuclear

Inspection Level

Standard acceptance days allowed

1

40

2

60

3

25

4

7

5

60

6

7

7

30

Code definitions for inspection level:

1 – All non-nuclear level 1 material. Inspection is in accordance with applicable receipt inspection procedure (RIP).

2 – Non-nuclear level 1 material for which an RIP is invoked.

3 – Non-nuclear level 1 material with no RIP, but technical receipt inspection is desired.

4 – General receipt inspection-all items not covered above.

5 – Used to identify class 3 or 4 industrial plant equipment which is to be inspected at the end use location by code 380 personnel.

6 – To be determined by DLA Land and Maritime

7 – Hazardous material, as defined in the technical data.