Part 4 - Procedures
CC-400 Scheduling.
(a) At a minimum, HCAs or their SCOs will -
(1) Conduct PMRs on contracting activities, to include subordinate contracting offices, regardless of the level, at least once every three years (36 months)
(2) Provide the schedule of reviews no later than 31 August of the preceding fiscal year to the ODASA(P) Procurement Insight/ Oversight (PI/O) Directorate.
(b) Waivers.
(1) The DASA(P) may grant, in writing, a 12-month extension, to the 36-month time frame, on a one-time basis, when circumstances are justified.
(2) Waiver requests shall be submitted with the annual PMR schedule of reviews.
(c) The DASA(P) may require, in writing, more frequent reviews of contracting activities as deemed necessary.
CC-401 Types of Procurement Management Reviews.
(a) The PMR is a tiered program that includes the following types of assessments:
(1) Type 1: Reviews of Internal Controls (other than key internal controls) conducted by the Contracting Activity (CA) Management, as needed, using assessment methods in accordance with Command, CA, local or other applicable guidance.
(2) Type 2: Reviews of Key Internal Controls conducted by the HCAs and SCOs to Offices of the Directors of Contracting and other subordinate contracting offices, at least once every three years (36 months), using the Internal Control Question Set, and any supplemental question sets or toolkits.
(3) Type 3: Reviews of Internal/Key Internal Controls, conducted by the ODASA(P), as needed for special assistance reviews and assessments, on selected CAs and/or ACE-wide, using the applicable question set(s).
(4) Type 4: Reviews of Strategic Controls conducted by the ODASA(P), annually, using the Strategic Control Question Set for CAs across the ACE.
(b) Contingency Contracting.
(1) The Contracting Support Brigades (CSBs), within the Army Contracting Command, execute theater support contracting actions in support of deployed Army forces, and commands and coordinates other common contracting actions as directed by the supported commander. The HCA is responsible for the authority, including contracting policy, compliance, and oversight of all deployed Army theater support contracting missions.
(2) In conjunction with any PMR performed on a CSB with continency contracting efforts/missions, the HCA shall utilize the Contingency Contracting Question Set, located on the PMR SharePoint page at Procurement.Army.Mil to assess the key internal controls of their contingency contracting operations.
(c) Top-level information on review responsibility, method of assessment, frequency of assessment, and assessment instructions is provided in the table below.
Type | Control Type | Primary Responsibility for Control Assessment | Method of Assessment | Frequency of Control Assessment | Assessment Instructions |
1 | Internal Controls (Other than Key Controls) | CA Management | Business clearance, legal review, local policy and compliance reviews and self-assessments | Action-by-Action IAW CA | CA |
2 | Key Internal Controls | HCAs, SCOs | Internal Control Question Set Contingency Contracting Question Set (as applicable) | At least once every three years (36 months) | AFARS Appendix CC |
HCA | SCO Toolkit | Annually | AFARS Appendix CC | ||
Per applicable policy | GPC Toolkit | Per applicable policy | AFARS Appendix EE | ||
Per applicable policy | SB Toolkit | Per applicable policy | Per Army OSBP | ||
Per applicable policy | OT Question Set | Per applicable policy | Per ODASA(P) | ||
Per applicable policy | Grants/ Cooperative Agreements Question Set | Per applicable policy | Per ODASA(P) | ||
3 | Key Internal Controls | ODASA(P) | Internal Control Question Set | As required/ requested | AFARS Appendix CC |
4 | Strategic Controls | ODASA(P) | Strategic Controls Question Set | Annually | AFARS Appendix CC |
CC-402 Preparation for Procurement Management Reviews.
(a) For ODASA(P)-led PMRs, the ODASA(P) will notify contracting activity 90 days, or as soon as practicable, before a planned PMR. The contracting activity shall provide the following in advance: metrics, specified statistics, lists of contracts, orientation data (such as vision and mission statements and standard operating procedures), logistical support, and copies of previous review reports and previous corrective action plans. The activity may identify special areas of emphasis and assistance after being notified of a planned PMR.
(b) All other PMRs should comply with the ODASA(P) PMR Standard Operating Procedures (SOP). Commands should establish Command/local procedures to supplement the ODASA(P) PMR SOP.
CC-403 Results of Procurement Management Reviews.
(a) Reports of PMR results will contain a risk assessment, analysis of issues, commendations, observations, findings, and recommendations as appropriate. PMR report findings must be specific and include sufficient information to enable root cause analysis. PMR recommendations must be based on supported findings and be actionable.
(b) Timely PMR result reports shall be provided. At a minimum -
(1) Reviewers shall submit the initial PMR report to the reviewed activity within 30 business days of the Out-brief.
(2) The responsible official must review and approve the Corrective Action Plans (CAP) and prepare a Final PMR report within 30 business days of CAP receipt.
(c) CAPs shall be created and implemented by the contracting activity. At a minimum -
(1) The contracting activity reviewed shall submit a CAP within 30 business days of report receipt.
(2) The reviewed activity must complete corrective actions – if any – within the agreed timeframe, inform the PMR Team Lead of corrective actions taken, and request closure of the CAP.