F-307 Receiving instructions.

If CQA and acceptance or acceptance of supplies is required upon arrival at destination, see F-301(b)(20)(v) for instructions.

Parent topic: Part 3 -PREPARATION OF THE WIDE AREA WORKFLOW (WAWF) RECEIVING REPORT (RR), WAWF REPARABLE RECEIVING REPORT (WAWF RRR), AND WAWF ENERGY RR